Building Specifications
- 100,000 ft2
- Over 40 year old building
- Located in Buffalo, NY
Before - Steam Boilers
Performance
- Uneven temperatures
- Cold dock areas
- High maintenance costs
Operating Costs
- 100,210 therms for 2002-03 heating season
- Normalized to 30 year averages
$0.95/ft2 Total cost
After - Cambridge Space Heaters
Performance
Operating Costs
- 32,900 therms for 2003-04 heating season
- Normalized to 30 year averages
$0.95/ft2 Total cost
Summary
The Cambridge system used 65% less gas. The Cambridge system saved approximately $62,000/year operating at $0.33/ft2 vs. $0.95/ft2.