Camp casey Story Image.jpg

How Two Military Bases are Keeping Fully Operational by Investing in their Facility’s Heating and Ventilation Systems

1 MIN READ
Camp Casey and Camp K16 are two U.S. military bases in South Korea that have invested in innovative HVAC solutions to maintain a healthy and comfortable working environment for their troops during harsh winters. Discover how the S-Series HTHV heating system and M-Series ventilation systems are helping these bases maintain even indoor air quality and warmth, and the training provided by Cambridge Air Solutions to ensure the equipment is being used to its full potential.

Read more

GrandOpeningBlogHeader.jpg

Make-up Air Production Facility Grand Opening Tour

1 MIN READ
Video recap from our livestreamed Grand Opening from Tuesday, June 29th, 2021. This 20 minute tour will be a quick glimpse into a lean workstation as well as a high-level look at what a people-centric culture is all about. We touch on continuous improvement (lean) and a close-up to what expansion during a pandemic looks like. We also showcase our M-Series Make-up air product line that brings in the fresh, tempered air into warehouses, factories and distribution centers all over the county.

Read more

Duct Smoke Detector Requirements For Make-Up Air & Heating Units.

3 MIN READ
Visit Cambridge's blog to learn whether a smoke detector should be installed on your new HVAC system, or why your inspector may have flagged this issue in the first place.

Read more

MakeupAirWithCooling.jpg

Cambridge M-Series Makeup Air with Evaporative Cooling

1 MIN READ
This video features our M-Series Makeup Air technology with evaporative cooling.

Read more