PracticeWhatYouAdvocateBlog.jpg

Practicing What You Advocate

2 MIN READ
Follow us on our journey of providing cooling for our facility.

Read more

Its More than Just 5000 Lean Videos

2 MIN READ
We hit a milestone recently where our company, mostly the folks in manufacturing, made our 5000th lean improvement video in just 3 short years.

Read more

AHRExpo2020-4.jpg

What Type of Cambridge Unit Do I Need?

1 MIN READ
you might have a small building with just basic heating needs. Or you might have a large facility that has mechanical exhaust and you need equipment that provides both exhaust replenishment and heating. Either way, knowing which products you need to provide the best indoor air quality for your facility is not always cut and dry. So take a minute and read over the infographic below.

Read more

Meet Scott Moore from the S-series Department

1 MIN READ
Here is another of the behind the scene faces here at Cambridge Engineering that you wouldn’t normally get to meet but make a profound difference in our culture and our desire to manufacture the highest quality products for you….our customer. Today we are pleased to introduce to you Scott Moore from our S-series department. Scott leads the team that manufacturers our S-series products and is also a Lean leader here at Cambridge. You can also find Scott helping out at Christmas as one of Santa's many helpers.

Read more

Meet Tommy in the Sheetmetal Department

1 MIN READ
We thought it would be fun to introduce the many behind the scene faces here at Cambridge Engineering that you wouldn't normally get to meet but make a profound difference in our culture and our desire to manufacture the highest quality products for you....our customer. Every couple of weeks we will post a new video of one of our team members that "Make a Difference" her at Cambridge. This month we are pleased to introduce to you Tommy Davidson from our sheetmetal department.

Read more

Why Dedicated HVAC Systems Are Better for Your Facility

2 MIN READ
For the facility’s unique processes and requirements, your team has designed and optimized every aspect of your operation. This optimization has become a minimum requirement for continued operation. But utilities and your HVAC systems are often thought of as ancillary systems. They become outdated and even neglected, despite this optimization of processes.

Read more